Ship For Sale | 4300 DWT 456 TEU Container Ship For Sale (2019 Built)
Ship For Sale | 4300 DWT 456 TEU Container Ship For Sale (2019 Built)
Ship For Sale | 4300 DWT 456 TEU Container Ship For Sale (2019 Built)
Ship For Sale | 4300 DWT 456 TEU Container Ship For Sale (2019 Built)
Ship For Sale | 4300 DWT 456 TEU Container Ship For Sale (2019 Built)
Ship For Sale | 4300 DWT 456 TEU Container Ship For Sale (2019 Built)

Ship For Sale | 4300 DWT 456 TEU Container Ship For Sale (2019 Built)

  • Inspection: ShangHai China

🚢 Shallow Water Specialist: 456 TEU Modern Feeder Asset

Vessel Inventory ID: S-CS-0291

This modern 2019-built Container Ship is a high-performance asset in the vessel trading market. Specifically engineered with an extreme shallow draft of 1.56m (light), it offers unmatched accessibility for river-to-sea logistics and regional feeder hubs where water depth is restricted.

📋 Capacity & Principal Dimensions

Container Capacity: 456 TEU
Deadweight (DWT): 4305T
Length Overall (LOA): 109.80M
L×B×D: 105.20M × 17.20M × 7.60M
Load Draft: 4.300M (Full) / 1.560M (Light)
GRT / NRT: 4243T / 2376T

⚙️ Engineering & Propulsion Performance

  • Main Engine: Twin WeiChai DIESEL WHM6200C (2 × 900kW @ 1000 rpm)
  • Generator Array: 2 × 90kW + 50kW + 2 × 30kW Emergency/Aux Units
  • Service Speed: Efficient 12 Knots Average
  • Fuel Economy: Outstanding 4T/Day Operational Consumption

📅 Classification & Maintenance Status

  • Classification: ZC Class (A1 + A2 Coastal Area)
  • Registry Port: AnQing City, China
  • Completion Date: January 29, 2019
  • Last Survey: January 28, 2024 (Recently Maintained)
  • Next Major Survey: January 29, 2029 (Long-Term Operational Window)
  • Crew Capacity: 11 Persons
Expert Acquisition Insight: For operators looking for high-ROI ships for sale in the feeder segment, this 456 TEU unit is a top-tier choice. Built in 2019, it features modern WeiChai propulsion and a double-engine configuration that consumes only 4 tons of fuel per day. The standout advantage for the 2026 buyer is the recently completed 2024 survey, which secures the vessel's operational status until early 2029. Its shallow draft capability makes it a versatile earner for challenging river-mouth or coastal routes.